Examples of our Work
View examples of our custom control panels builds across a range of industries and read our project spotlights to learn more about our design, build, and control system integration capabilities.
Refrigeration (Airixa)
- Mild steel 2-door enclosure
- PLC rack with additional I/O racks
- 22" touch display
- (2) Ethernet switches
- Ewon Cosy remote access gateway
Food & Beverage
- NEMA 4X 2-door stainless steel enclosure
- 15" touch display
- PLC rack
- (16) Variable frequency drives (VFD)
- (3) 480:120V transformer
Food & Beverage
- NEMA 12 mild steel enclosure
- Flex I/O rack
- Ethernet switch
- Door-mounted circle chart recorder
- Filter regulator
- Green & amber stack lights
Municipal Biofuel
- NEMA 12 mild steel free standing enclosure
- (3) Variable frequency drives (VFD)
- (2) Cooling filter fans
- Ethernet switch
- Molded case circuit breaker
Food & Beverage
- NEMA 4X stainless steel watershed enclosure
- PLC rack
- (7) Variable frequency drives (VFD)
- Ewon Cosy remote access gateway
- Ethernet switch
- Safety underspeed monitor
- (2) Flame detector relays
Food & Beverage
- NEMA 4X stainless steel enclosure
- 24" industrial touch panel
- IOLOGIK remote ethernet I/O modules
- Ethernet switch
- Ewon Cosy remote access gateway
Project Spotlights

Food & Beverage
Process Solutions Commissions New Fryers and Modern Control System for a Michigan Based Potato Chip Company
Process Solutions recently completed a project for a small potato chip company that entailed the commissioning of new batch fryers coupled with the design, build
May 18, 2018

Food & Beverage
Latest Airixa Install Brings Modernized Refrigeration Control Systems to Two Avocado Processing and Storage Facilities in Mexico
If you purchased an Avocado this year with a sticker on it proclaiming, “Produce of California” or “Produce of Mexico,” there is a good chance
November 1, 2017

Project Spotlight
Process Solutions Delivers Control Panels for New University of Washington Chiller Plant
Process Solutions is in the late stages of a major industrial chiller project on the University of Washington’s campus. The plant, which is located on
September 1, 2016

Project Spotlight
Process Solutions Commissions New Control Panel For Hydroelectric Dam
A Northwest customer approached Process Solutions to design and build a new control panel for the Powerhouse of an existing Hydroelectric dam. Construction of the
May 11, 2015